Project Case Studies
A datasheet tells you what a set can do. A project tells you how the numbers were chosen. Each case below starts from the site - the grid, the climate, the load - and works forward to the engine, the alternator, the canopy and the control gear we would put on it, so you can follow the reasoning rather than take a configuration on trust.
They are written as scoped scenarios, not delivery claims: no client name, no commissioning record, nothing we cannot show you. If your project looks similar, send the load profile and we will tell you what the equivalent configuration would be.
Philippines · Healthcare / Emergency Backup
250 kVA Silent Backup Power for a Metro Manila Hospital
Six 250 kVA silent sets for a Metro Manila hospital, calibrated for 60Hz 220V single-phase emergency supply with <10s ATS transfer.
Read the case study →
Vietnam · Mining / Crushing Plant
800 kVA Open-Frame Prime Power for a Northern Vietnam Nickel Mine
Two 800 kVA open sets running 14 hours a day as main power to a remote nickel-ore crushing plant, with dual-stage air filtration for dust.
Read the case study →
Get a technical quotation for your project
Send your load, country and frequency requirements — an engineer will confirm configuration, pricing and shipping.